The core technology undertakes Shunde floor paint Nanhai floor paint Sanshui floor paint Gaoming epoxy floor paint

Basic treatment 1 The basic treatment is based on cement floor or grindstone;
2 The ground needs to be maintained for more than 26 days, and the water needs to be less than 8% before the construction can be re-grounded if there is any unevenness or empty drum. 3 fill the ground with epoxy mortar;
4 The ground oil should be thoroughly cleaned;
5 Keep the construction floor dry and clean before construction;

The primer layer 1 should be kept clean and free of impurities during the construction, and the main agent and the hardener should be mixed and stirred according to the correct ratio;
2 It is necessary to adjust the appropriate viscosity according to the ground conditions and complete the construction within 5 hours;
3 The undercoat layer has a hardening time of about 6 hours or more.

The middle coating 1 needs to be kept clean before construction. If there is adhesion of impurities, it is necessary to remove the main agent and hardener according to the correct ratio and stir well;
2 adding the appropriate amount of the mixed resin to the quartz sand;
3 Use a file to roll the material evenly.
4 The completed material needs to be completed within 30 minutes;
5 The construction junction is well handled.
6 medium coating maintenance hardening time of about 6 hours or more.

The soil layer 1 mixes and stirs the main agent and the hardener according to the correct ratio;
2 use a batch knife to coat the material evenly;
3 The completed material needs to be completed within 30 minutes;
4 batches of soil maintenance hardening time of about 8 hours or more;
5 According to the actual needs of the construction of several requirements to achieve a flat non-porous hole, no batch of knife printing and sanding printing.

Topcoat 1 should be kept clean and hygienic before construction.
2 before use, the main agent is stirred first;
3 mixing and stirring the main agent and hardener according to the correct ratio;
4 The material is evenly coated and mixed using a file to complete the construction within 40 minutes;
5 The construction junction should be handed over;

Chuangyuan Pingping Paint Engineering Co., Ltd. Foshan Office:

Service hotline, 0757-63367966



Manager Chen QQ

Foshan Office Address: Tianan Digital City, Nanhai, Foshan

Guangzhou Headquarters Address; Haitian Building, Guanghai Building, Zhongshan Road, Tianhe, Guangzhou

Company website http://

路路通http://gzcydpq.3566t.com/

Lights Network: http://shop.denghuo.com/369742/

Business treasure website: http://

Electromechanical home; http://GZCYDPQ.jdzj.com

International Business Network http://gzcydpq.b2bvip.com/

Zhongke Business Network; http://GZCYDPQ/

Http://Company/Detail/213433.html http://guangzhou0428403.11467.com/

Http://gzcydpq.ximatou.com

Http://gzcydpq.jdol.com.cn/

Http://gzcydpq.wjw.cn/

Http://gzcydpq.cn.cn5135.com

Http://gzcydpq.cntrades.com/

Chinese supplier: http://gzcydpq.cn.china.cn/


6After construction is completed, one person can be employed after one day, and the pressure can be heavy after three days (based on 250C, the opening time should be moderately extended at low temperature)

The core technology undertakes Shunde floor paint Nanhai floor paint Sanshui floor paint Gaoming epoxy floor paint
'Core technology to undertake Shunde floor paint Nanhai floor paint three water floor paint Gaoming epoxy floor paint