Research on Construction Technology of Plastic Formwork Engineering
First, the process principle of plastic formwork engineering.
The plastic formwork support system integrates the advantages of large steel formwork with those of wooden formwork, offering a flexible and easy-to-install solution. The plastic templates can be directly connected using nails fixed on the wooden edges (refer to Figures 1 and 2). Depending on the dimensions of the concrete structure, the panels can be assembled in any direction—both longitudinally and transversely. This makes the construction process more efficient, and the final concrete shape is more accurate due to the use of specialized clamps for locking. Using plastic formwork ensures a better surface finish for the concrete compared to traditional steel, wood, or bamboo formwork, making the overall construction process more convenient and practical.
Second, the production process and operational points of low-foam multi-layer plastic building formwork.
The manufacturing process and operation details of this type of formwork are covered under a product patent and have passed technological evaluation. The dismantling process of the plastic formwork is illustrated in Figure 3.
Dismantling Process:
1. It's important to control the timing of demolding. If removed too early, the concrete may stick to the mold. Once the concrete has fully cured, it will naturally separate from the formwork, making the removal faster and easier.
2. Demolition must be approved by the technical department, and an official order must be signed before any work begins. Unauthorized removal is strictly prohibited.
3. When removing the bottom formwork, follow the guidelines outlined in GB50204-2002, the "Code for Acceptance of Construction Quality of Concrete Structure Engineering." The operation team should apply for approval from the project’s technical department before proceeding.
4. The template removal should be carried out by a dedicated team following a systematic approach. Always remove lateral supports first, then proceed to dismantle vertical supports.
5. After the plastic formwork is removed, the working area should be clean, free of dust and debris. There is no need to apply a release agent to the concrete surface since the plastic formwork ensures a smooth and clean contact.
Third, materials and equipment.
Material preparation includes low-foam multi-layer plastic building formwork, channel steel, angle iron, wooden squares, nails, bolts, reinforcing bars, and sponge strips. These materials are essential for ensuring the stability, durability, and efficiency of the formwork system during construction. Proper selection and handling of these components contribute significantly to the success of the entire project.