Research on Construction Technology of Plastic Formwork Engineering
First, the working principle of plastic formwork engineering.
The plastic formwork support system integrates the advantages of large steel formwork with those of wooden formwork, offering ease of installation and flexibility. The plastic panels can be directly joined by fixing nails on the wooden edges (refer to Figures 1 and 2). Based on the dimensions of the concrete structure, the formwork can be connected and assembled in any direction—both longitudinally and transversely. This makes the construction process more convenient, and the accuracy of the concrete shape is significantly improved through the use of special clamps. Using plastic formwork not only enhances the surface quality of the concrete but also simplifies the construction process compared to steel, wooden, or bamboo formwork.
Second, the production process and key operational points of low-foam multi-layer plastic building formwork.
The production process and operation techniques of low-foam multi-layer plastic building formwork are covered under a product patent and have been recognized as scientific and technological achievements. The dismantling process of the plastic formwork is illustrated in Figure 3.
Dismantling Process:
1. Control the timing of demolding. If the formwork is removed too early, the concrete may stick to the mold. Once the concrete has fully hardened, it will naturally separate from the formwork, making the removal process faster and easier.
2. Demolition must be authorized by the construction technology department, and a signed order is required. Unauthorized removal of the formwork is strictly prohibited.
3. The removal of the bottom formwork should follow the guidelines outlined in GB50204-2002, "Code for Acceptance of Construction Quality of Concrete Structure Engineering." The operation team must apply for approval after receiving technical clearance.
4. The formwork removal should be carried out by an operation team following a structured approach. The principle is to first remove lateral supports before disassembling vertical supports.
5. After removing the plastic formwork, the working area should be clean, free of dust and debris. There is no need to apply a release agent on the concrete contact surface.
Third, materials and equipment.
Material preparation includes low-foam multi-layer plastic building formwork, channel steel, angle steel, wooden squares, nails, bolts, steel bars, and sponge strips. Additionally, tools such as wrenches, hammers, and measuring instruments are essential for proper installation and alignment. It's important to ensure that all materials are stored in a dry and organized manner to maintain their quality and efficiency during the construction phase. Regular inspection and maintenance of the formwork and supporting structures are also recommended to ensure long-term durability and safe usage.